New IDEC Manufacturing Operation.
The first hybrid-design-build project in the life science industry. Utilized large (100'+) process modules constructed and functionally tested remotely. Provided budget management resulting in $10,000,000 in savings.
$363,000,000 program (CA)
Selected as Facility Of The Year by International Society of Pharmaceutical Engineers.
National Alabama Corporation
This railroad car manufacturing plant was over 2.2Msf under roof and nearly 1 mile long. Developed 640acre site and erected 23,300tons of steel in 15wks. Start of excavation to first Process Area turnover in only 8months.
$330,000,000 program (AL)
Utilized KanBan systems to significantly reduce manufacturing equipment start-up & installation time.
Intel Fab 23
200mm semiconductor wafer fabrication facility, 14 buildings w/over 200ksf Class 1 cleanroom space, in just 14mo. Developed patented modular cleanroom system utilized to significantly reduce schedule, increase quality and provide safer installation.
$708,000,000 construction (CO)
Recognized as "fastest ever" construction and start-up of 200mm wafer fab.